The hardest part of building a new ride is waiting for the parts to arrive on site.

 

Okay, maybe it’s not the hardest part, but for those of us with patience issues, there comes a time when we can’t wait to get our shiny new fiberglass and steel!

 

So imagine our excitement when these pieces arrived:

IMG_4509

 

Fiberglass1

MASSIV will need 203 fiberglass parts. We’ve counted. They are all there.

 

Here is the steel being off-loaded.

fiberglass delivery

 

 

IMG_4507

 

steel arrives

 

This is part of the steel tower structure. With the many twists and turns of this massive slide, there are several towers as you can see from the original drawing.

The team has also gotten a good bit done on the footing side of things as you can see below. As soon as we have steel going up, we’ll be posting a video or two.
Timelapse314

 

Massiv-no measurement